Construction scheme of wiring works
2021-11-13

1. Survey site

The main task is to negotiate the network requirements with the customer, investigate the building on site, investigate the wiring construction site according to the location and quantity requirements of information points proposed by the user, refer to the building plan, decoration plan and other data, combined with the network design scheme, preliminarily book the number and location of information points, and preliminarily locate the trunk route and cabinet. The survey objects include: building structure, location of machine room (equipment room) and wiring management room, wiring route, electromagnetic environment, appearance of wiring facilities and damage to buildings (such as through wall holes, etc.). It is also considered to avoid strong current and other lines while making use of the existing space, and make an integrated wiring Research Report.

Construction scheme of wiring works

2. Planning and design

The regular design of the project will have a decisive impact on the whole process of the wiring project. Therefore, we should comprehensively consider the cost budget, application requirements, construction progress, etc. according to the research results, and start to make a detailed design scheme. Under the guidance of professional standards and regulations of the generic cabling system, we should fully consider the requirements of the network design scheme for the wiring system Conduct overall feasibility analysis, such as spatial distance, bandwidth, information point density and other indicators, and conduct detailed design for each subsystem. If the building group is under construction, it shall timely put forward the generic cabling scheme, and put forward specific requirements for the building design according to the overall layout and routing, such as the connection of trunk channels between buildings and the routing of channels between floors Line specifications, pipe embedment, etc., so that the subsequent construction can be carried out smoothly. If there are major defects in the wiring system design scheme, irreparable losses will be caused once the construction is completed. Therefore, users, network scheme designers and wiring engineers should jointly participate in the review of the scheme. If possible problems are found, the review must be carried out after the scheme is modified Until the final plan is formed.


3. Construction scheme
Determine the detailed construction details (such as wiring route, through the wall hole, etc.) according to the wiring system design scheme, comprehensively consider the management and operation in the design implementation, designate the project leader and project supervision personnel, and plan the construction organization and management of each material, each work and internal and external coordination. The cooperation degree of the user shall be considered in the construction scheme. It is best to let the user know and obtain the approval of the management department of the other party for the possible damage to the pavement and buildings caused by the wiring scheme. The construction scheme shall be negotiated with the user, approved and signed by the user, and the Coordination Director shall be appointed to cooperate.


4. Budget estimate
The budget estimate is mainly based on the building plan and other data to settle the consumption of wire, and calculate the cost of wiring materials, wiring tools, labor costs and construction period.


5. Site construction
The realization stage of generic cabling engineering system mainly includes civil construction: coordinate the construction team to discuss responsibilities with the owner and put forward wiring permission, mainly including drilling, wiring, information socket positioning, cabinet positioning, making wiring marking system, etc. Technical installation: it is mainly installed inside the cabinet, including information module and distribution frame. The interior of the cabinet shall be arranged neatly and reasonably, clearly divided into blocks and clearly marked for future maintenance. Different brands of products may have different special equipment for wiring.