Engineering application generic cabling engineering general steps
2021-11-13

The general steps of engineering application generic cabling project are: Investigation - scheme design - civil construction - technical installation - information point test - document sorting - maintenance.

Engineering application generic cabling engineering general steps

(1) Research: the main task is to inquire about the customer's network needs, investigate the building on site, settle the consumption of wires, the number of information sockets and the positioning and quantity of cabinets according to the building plan and other data, and make a generic cabling Research Report;


(2) Wiring engineering scheme design: make wiring material budget table and project schedule according to the preliminary survey data;


(3) Civil construction: coordinate the construction team to discuss responsibilities with the owner and put forward wiring permission, mainly including drilling, wiring, information socket positioning, cabinet positioning and line marking;


(4) Technical installation: it mainly refers to the internal installation of information module, distribution frame and cabinet;


(5) Information point test: the general test adopts 12 point tester, which can be carried out by one person with high efficiency. It mainly tests the on-off condition, and can print out the detailed test report;


(6) Document management: finally, the completion report (material actual consumption table, test report, floor (building group) wiring table) to the customer shall be provided to provide data basis for future maintenance;


(7) Maintenance: respond quickly in case of line failure.