Water and electricity equipment: whether the site has necessary water and electricity facilities for construction.
Power load: whether the power line on the construction site can meet the load requirements of the project.
Equipment layout: determine the position of cabinet, installation position of terminal equipment and laying route of line.
Sample style: specify the customer's requirements and determine the model and style of the sample. To form a document, the customer signs for confirmation.
Safety: safety of raw materials, fire prevention and anti-theft measures at the construction site.
2. Draw network topology map and layout map and submit them to the customer for confirmation.
3. Prepare the project schedule. List the work tasks to be completed during construction and the completion order of each work, and determine the detailed plan time, as shown in the figure below. After the completion of the project schedule, a copy shall be submitted to the customer for customer supervision and cooperation.
4. The project leader and project supervision personnel shall be designated for the weak current project to be responsible for planning materials preparation, work preparation, user's cooperation requirements, putting forward the cooperation schedule of various departments, and responsible for internal and external coordination and construction organization and management.
5. For on-site construction, the construction progress shall be recorded every day, and the plan shall be adjusted in time according to the completion of the plan to ensure that the project is delivered according to the construction period and requirements.
6. Field certification test, make test report, print IP address table, routing table and configuration table.