Operation flow of access control system installation
2021-10-18

Access control system is a new modern security management system. It integrates microcomputer automatic identification technology and modern security management measures. It involves many new technologies such as electronics, machinery, optics, computer technology, communication technology, biotechnology and so on. Access control system is an effective measure to solve the security management at the entrance and exit of important departments. It is applicable to various confidential departments, such as banks, hotels, parking lot management, machine rooms, armory, confidential rooms, offices, intelligent communities, factories, etc. Do you know what procedures are used in the installation of access control system?

Operation flow of access control system installation

Access control system:

1、 Visit the site: first, check the site environment and door materials to determine which lock is suitable for installation. If required by the user, it shall be carried out according to the user's requirements. If there is a better plan, both parties can negotiate to determine the final construction plan.


2、 Wiring: before wiring, determine the direction of the lower wiring. Good safety and beauty shall also be considered during wiring. On the premise of not damaging the wall, it shall be practical, safe and economical as far as possible, and open lines shall not be taken as far as possible. If it is necessary to drill holes and nail trunking on the wall, it should be explained to the user. It is best to have a written agreement to avoid unnecessary trouble in the future.


3、 When wiring, label both ends of the line so that it can be seen at a glance. The connection of power lines shall follow the principles of white positive and black negative, red positive and black negative to prevent joints between power lines and TV lines, which is also a special problem to be paid attention to in the installation of access control system.


4、 Equipment installation: when installing the magnetic lock, if it is necessary to punch holes on the door, you can punch holes according to different materials of the door.


5、 Commissioning: connect the power supply, press the button, check whether the door opening time is appropriate, and deliver it after the access button works normally.


6、 Delivery: explain the use method to the user.


7、 After sales service: the product is pasted with the manufacturer's company label and service hotline.